HOME
|
|
OUR PROJECTS
|
CLIENTS
|
NEWS
|
CONTACT US
GREEK
Project Categories
2. Machinery assembly and installation
3. Steel structure frame buildings
4. Environmental projects
Biogas
Biological Treatment
Combined heat and power units (CHP)
Gas
Geothermal energy
LPG (Liquefied petroleum gas)
5. Residential development - Shopping malls
6. Electromecanical projects - pipe-line installations
7. Public Projects
District heating projects
Land reclamation projects - pumping stations
School complex - educational parks
Sports facilities
Various building projects
Waster supply & sewerage projects
8. Photovoltaic Systems
9. Steel structure factory
HACKED
6. Electromecanical projects - pipe-line installations
>
Project list
OUTDOOR LIGHTING OF HELLENIC RAILWAY UNIT
CONSTRUCTION OF DISTRICT HEATING SYSTEM?S AUTOMATION IN KOZANI
THERMAL ENERGY TRANSFER SYSTEM?S EXTENSION – RETROFITS IN KOZANI?S DISTRICT HEAT PUMPING STATIONS
CONSTRUCTION OF REFRIGERATED CHAMBER
ROLLER SAND FILTERS, AT HELLENIC STEEL
FACILITIES' MODERNIZATION IN EXALCO INDUSTRIAL UNIT
ELECTRICAL INSTALLATIONS IN DAIOS LUXYRY LIVING 5 STAR HOTEL IN THESSALONIKI
CONSTRUCTION – RENOVATION & MODERNIZATION OF MALGARA?S PUMPING STATIONS
KILKIS? STADIUM LIGHTING
EQUIPMENT ASSEMBLY, CONSTRUCTION OF PAINTING CABIN& ROBOTICS WAREHOUSE AT HELLENIC ALUMINIUM INDUSTRY'S UNIT (ELVIAL)
CONSTRUCTION OF CHANEL FOR REFINERY PRODUCTS? MARINE LOADING STATION
ELECTRICITY GRIDS & ELECTRICAL INSTALLATIONS? UPGRADE & FLIGHT SIMULATOR?S (ATD) INSTALLATION
DISASSEMBLY OF SMELTING BOILER?S MECHANICAL EQUIPMENT, SUPPLY AND MANUFACTURING OF ELECTROMECHANICAL INSTALLATIONS AND PIPELINES OF THE FURNACE, AT HELLENIC STEEL
CONSTRUCTION OF DISTRICT HEATING PIPING SYSTEM IN KOZANI
CONSTRUCTION OF DISTRICT HEATING PUMPING STATION IN KOZANI
EXPLOITATION OF ERATEINO GEOTHERMAL FIELD IN THE MUNICIPALITY OF NESTOS, PREFECTURE OF KAVALA
LIGHTING – REHABILITATION OF ROADS AND PUBLIC SPACES IN ECHEDOROS CITY SECTION
ELECTROMECHANICAL (MEP) INSTALLATIONS AT THE PROJECT “CONSTRUCTION AND INSTALLATION OF 1MW BIOGAS UNIT FOR THE PRODUCTION AND SALE OF ELECTRICITY FROM R.E.S.”
TWO AIR DUCTS’ INSTALLATION FOR THE MACHINERY’S DUST REMOVAL SYSTEM
REPAIR WORKS REGARDING THE DUST REMOVAL SYSTEM AT MAXI’s PLANT
SUPPLY AND PIPING CONSTRUCTION AT THE RURAL DISTRICT HEATING NETWORK
PUMPING STATION AND DAM’S UPGRADE WORKS IN ANAVALOS, ARGOLIDA
CONSTRUCTION OF INTERNAL DRAINAGE NETWORKS, PUMPING STATIONS AND PIPELINES AT TRILOFOS AND KARDIA AREAS, AT THERMI’S MUNICIPALITY